- Home
- Energy Retrofits
- Projects
- Finance
- Financial workshops
- 1st Financial workshop - London, UK
- 2nd Financial workshop - Bratislava, SK
- 3rd Financial workshop - Copenhagen, DK
- 4th Financial workshop - Dublin, IE
- 5th Financial Workshop - Milan, IT
- 6th Financial Workshop - Leipzig, DE
- 7th Financial Workshop - Sofia, BG
- 8th Financial Workshp - Sophia, BG
- 9th Financial Workshop - Växjö, SE
- 10th Financial Workshop - Barcelona, ES
- 11th Financial Workshop - Barcelona, ES
- 12th Financial Workshop in Paris, France
- Final Financial Workshop
- Questionnaires
- Financial workshops
- Products
- Events/Awards
- Downloads
OP19 - Architecture Office Archipente
Current status:
ON SITE PROJECT
Country:
France
Building Owner:
Cabinet d'architecture Archipente
Consulting EuroPHit Partner:
LaMP - Contact person Simon Camal
Existing treated floor area (usable floor space):
151.00 m²
Original situation:
Office in timber frame constructed in 1995.
100 mm wood fiber between timber, roof partially insulated with 200 mm wood fiber.
Windows with wooden casement double glazing filled with air, near end of service life : poor airtightness, defected sealants.
Poor airtightness measured by blower door test before retrofit measures : n50 = 7 h-1
Heating consumption : 150 kWh/(m².a) verified by calibrated PHPP on heating season 2014.
Modernisation proposal:
Retrofit steps :
- New windows of passive house quality triple glazing with exterior shutters
- Take out cladding, Apply airtight membrane, Install new insulation layer with wooden fiber, Replace cladding.
- Insulation and airtightness at junctions on plywood eave.
- Mechanical ventilation with heat recovery
Current situation:
Detail design
Concept studied for airtightness in the context of dispersive layout of electrical cables.
Other downloadable materials:
Address:
-
42600 Montbrison
France